Shore power for cruise ships calling at Revierkaia in Oslo will be ready in March 2024:
- The new shore power facility will have an output of 10MVA
- Voltage levels: 6,6kV/11kV
- 50/60Hz frequency conversion
- Compliance with IEC 80005-1 standard
Shore power for cruise ships calling at Filipstadkaia in Oslo will be ready in 2025:
- Information about the shore power plant at Filipstadkaia will come later.
Ahead of arrival:
To connect quickly and efficiently to our shore power plant for cruise ships, we need some details about your ship's shore power connection:
- Max power capacity
- Voltage levels and frequency
- Location of the connector to the ship
- Contact information for PIC on the vessel.
- If the vessel has been connected to shorepower before.
Booking:
Please contact the Harbor Guard: 0047 91799900/havnevakt@oslohavn.no.
For new customers or other questions:
Please contact us at landstrom@oslohavn.no